• A reliable factory for custom aluminum extrusions, machining parts and assembled products
  • Leave Your Message

    A reliable factory for custom aluminum extrusions, machining parts and assembled products

    Aluminum angle for curtain wall with plastic boot
    Building hardware

    Aluminum angle for curtain wall with plastic boot

    •Condensation Prevention: Limits temperature differentials across the structure, reducing the risk of condensation buildup inside the wall system.
    •Impact Resistance: The plastic boot absorbs vibrations and shocks during installation or building movement, protecting the aluminum angle from deformation or surface damage.
    •UV and Weather Resistance: High-quality plastics (e.g., PVC or nylon) resist degradation from sunlight, extreme temperatures, and weathering.
    •Alignment and Fit: The plastic sleeve ensures precise alignment during assembly, reducing installation errors.
    •Friction Reduction: Acts as a lubricant, allowing smoother adjustments when connecting panels or framing components.
    •Scratch Prevention: Protects the aluminum’s anodized or powder-coated finish during handling and installation.
    •Hidden Connections: Plastic boots allow for cleaner, seamless joints in the curtain wall, maintaining the system’s visual uniformity.
    •Color Customization: Plastic sleeves can be manufactured in colors matching the aluminum or curtain wall design, enhancing architectural aesthetics.
    •Lightweight Design: Aluminum’s low weight combined with plastic components reduces transportation and labor costs compared to bulkier alternatives.

      Product Details

      主图7

      Use:Curtain wall part

      Material:Aluminum alloy 6063-T6 per AA standard, other aluminum alloy is also available

      Dimension:100x120x60mm

      Weight:around 250g/pc

      Processing:Alloy melting-Extruding-cutting- machining-deburr -assemble- inspection and packing

      OEM/ODM:per customer’s requirements. We can develop new products together.

      Surface Treatment:Sand blasting and satin anodize or black anodize or painting or powder coating (UV proof and bear 500hours salt spray test) are also for selection

      Packaging:Each pc in polybag (one end sealed),foam sheet separates each pc, 10pcs/ carton, then packed with pallet, customized packing is also available

      Production Leading Time: For items per customer’s specification, mold developing and sample confirmation is 12-15 days, production leading time is 15-20 days after sample confirmed.

      MOQ:1000pcs

      Supply Ability:300000 pcs per Month

      Payment Terms:30% deposit before production, the balance paid before loading.

      Port: Shenzhen or Guangzhou.

      Place of Origin:China, Guangdong

      Certifications:ISO9001, ISO14001, ISO45001, RCV, and GRS